Washington ferry riders heading into Thanksgiving face canceled evening sailings on Port Townsend/Coupeville, overnight limits for low-clearance trucks serving Vashon Island and holiday timetables on several Puget Sound routes. The first cancellations still ahead are Tuesday, Nov. 24: 6:45 p.m. from Port Townsend and 7:30 p.m. from Coupeville.

Washington State Ferries announced the holiday travel plan Nov. 20. It expects about 300,000 passengers from Wednesday through Sunday. Large tides create strong currents near Coupeville's Keystone Harbor, complicating safe maneuvering. Low water also steepens loading ramps, which can leave trucks, RVs and vehicles towing trailers vulnerable to scraping underneath.

Port Townsend and Coupeville cancellations

The operator's tidal cancellation table lists these departures as canceled. Every time below is p.m. Pacific.

DateFrom Port TownsendFrom Coupeville
Tuesday, Nov. 246:457:30
Wednesday, Nov. 256:45 and 8:307:30 and 9:10
Thursday, Nov. 268:309:10
Friday, Nov. 278:309:10

Wednesday loses two departures from each terminal, compared with one per terminal on the other three dates. Someone planning an evening crossing Wednesday therefore has fewer late options than the cancellation count for Thanksgiving itself might suggest.

The crossing normally takes about 35 minutes. A canceled departure cannot be treated as a late-running boat; choose an operating sailing or another route. WSF identifies Edmonds/Kingston and Mukilteo/Clinton as alternatives. Those crossings serve different terminals, so changing routes also changes the driving portion of a trip.

Low-clearance truck windows at Vashon

Loading ramps and trestle at Vashon Heights ferry terminal.
Vashon Heights terminal on July 22, 2006. This archive view does not show current repairs or ramp conditions.Photo: Joe Mabel / Wikimedia Commons, CC BY-SA 3.0.

WSF's vehicle restriction notice says trucks with less than 14 inches of ground clearance should avoid Fauntleroy/Vashon, Southworth/Vashon and Point Defiance/Tahlequah during the specified periods. That threshold applies to trucks; it is not a blanket restriction on every passenger car.

Restriction beginsRestriction ends
Tuesday, Nov. 24, 8:40 p.m.Wednesday, Nov. 25, 12:10 a.m.
Wednesday, Nov. 25, 9:20 p.m.Thursday, Nov. 26, 1 a.m.
Thursday, Nov. 26, 10:10 p.m.Friday, Nov. 27, 1:45 a.m.
Friday, Nov. 27, 11:10 p.m.Saturday, Nov. 28, 2:25 a.m.

Another window runs from 12:35 to 2:50 a.m. Sunday, Nov. 29. All times are Pacific. The after-midnight end of Friday's window falls on Saturday; Sunday's early restriction begins after Saturday night.

WSF advises drivers of RVs, trailers and other low-clearance vehicles to use higher tides for safer ramp clearance. Additional restrictions can be imposed on Edmonds/Kingston, Mukilteo/Clinton and Seattle/Bainbridge if conditions require them.

Thanksgiving timetables and the return trip

The holiday announcement lists schedule changes for Thursday, Nov. 26. Seattle/Bainbridge and Fauntleroy/Vashon/Southworth use holiday timetables. Edmonds/Kingston, Mukilteo/Clinton and Point Defiance/Tahlequah have some holiday adjustments. Other routes keep their regular Thursday schedules.

Crowds are expected westbound or onto islands Wednesday and Thursday, eastbound or off islands Saturday and Sunday, and in both directions Friday. WSF suggests early or late sailings, or walking or biking aboard with transit connections where practical. Choosing a quieter hour still requires checking that the boat is operating and that any vehicle restriction has ended.

Kingston boarding passes and Vashon repairs

Vehicles waiting to board a ferry at Fauntleroy terminal in West Seattle.
Vehicles at Fauntleroy terminal in May 2005. This archive photograph does not show today's queue.Photo: Chas Redmond / Wikimedia Commons, CC BY 2.0.

The current rider bulletins require a Kingston vehicle boarding pass daily from 8 a.m. to 8 p.m. through Nov. 29. It holds a place in line; the ferry ticket is purchased separately. Take the pass at the automated dispenser before the terminal ticket booth, then wait for the green signal. Drivers who leave the line must re-enter and take another pass.

Vashon terminal repairs begin Saturday, Nov. 28. Additional loading lanes close from sunrise through midafternoon Sunday, Nov. 29, when WSF expects loading and unloading delays. The agency plans to reopen all lanes before the Dec. 5 and 6 weekend. Follow terminal staff around the work area. The operator's website and mobile app offer live terminal conditions and a real-time vessel map, allowing riders to check the vehicle queue and boat locations before heading to the terminal. WSF restricted traffic over a section after an inspection found two deteriorated timber piles supporting the trestle.