The Transportation Department's inspector general plans to begin a new audit in December of how the Federal Aviation Administration oversees aircraft manufacturers' quality assurance systems for suppliers. The review will cover domestic and foreign suppliers, according to a November 20 audit memorandum.
The announcement follows changes to the FAA's risk assessments and tracking tools, as well as earlier findings about Boeing production oversight. It is an audit plan, with no new findings or flight restrictions announced in the memo.
For passengers, the issue is how defects are caught before an aircraft enters service. A manufacturer can have an approved airplane design and still face failures in the process used to build it. This review will examine the FAA's supervision of the systems meant to keep supplied parts consistent with manufacturers' requirements.
Who is responsible for supplied parts?
The FAA’s aircraft certification overview assigns manufacturers responsibility for supplier oversight and for consistently producing aircraft that match the approved design. It describes production approval as an evaluation of the ability to manufacture safely and repeatedly. The FAA scrutinizes the quality management and manufacturing controls supporting that work.
A production certificate authorizes manufacturing under an FAA-approved design. In evaluating an application, the FAA audits the applicant's organization, facilities, quality system and approved data. It identifies required corrective actions and can conduct additional audits before issuing approval.
Continued oversight includes the FAA's quality system audit process. That process compares actual operating practices with regulations, approved data and internal procedures. Inspectors categorize inconsistencies, provide the results to the manufacturer or delegated facility, and analyze the information for trends. The new inspector general review will test the effectiveness of oversight, rather than certify an individual flight.
What earlier Boeing audits found

The inspector general's October 2024 Boeing production report found weaknesses in audit planning and the systems used to identify and resolve production problems. It said FAA audits were not structured to comprehensively assess production or targeted through data-driven risk assessments.
The report also found inadequate oversight of supplier conformity. First Article Inspections are intended to establish at the outset whether a supplier's processes can produce parts that meet engineering and design requirements. The FAA had not required inspectors to review those inspections, the report said.
Sixteen recommendations followed. The report's current recommendation list records June 29, 2026, closures for guidance on manufacturing risk assessments, structured audits and review of supplier controls, among other actions. Other entries, including supplier risk assessments and tracking repeat noncompliance, have no closure date displayed. Those are the statuses shown on the report page, not findings from the new audit.
The door plug investigation

The NTSB's June 2025 findings explain the consequences of a failed production process. Alaska Airlines Flight 1282 lost its left mid-exit door plug after departing Portland on January 5, 2024. Seven passengers and a flight attendant received minor injuries.
Investigators found that four bolts needed to secure the plug were missing before the accident. The plug had been opened at Boeing's Renton factory for rivet repairs, then closed without the required documentation. No quality assurance inspection of that closure occurred.
The NTSB attributed the accident to inadequate Boeing training, guidance and oversight of its parts removal process. It also found that FAA oversight failed to ensure Boeing corrected recurring problems with that process. Those conclusions concern the 2024 accident; the new supplier audit has yet to produce its own conclusions.
What happens next
The inspector general plans work at FAA headquarters and regional offices, with other locations to be determined during the audit. Its memorandum names no completion date. It says the office's previous report specifically on FAA oversight of aircraft manufacturers' suppliers was issued in 2008.
The forthcoming review will assess oversight after the FAA updated its risk assessment practices, launched a new manufacturer tracking system and announced plans to revise its model for assessing production approval holders' risk.