Drivers crossing the Hudson River between Fort Lee, New Jersey, and upper Manhattan will have to use the George Washington Bridge’s upper deck for most of the night Monday through Thursday, Nov. 16 to 19. The Port Authority plans to close the lower deck toward New Jersey at 9 p.m. and toward New York at 9:30 p.m. each night. The two directions reopen at different times the next morning.
The first closure starts Monday evening, so a trip that begins Monday night and ends after midnight is still affected. The same pattern repeats through Thursday night into Friday morning. All times below are Eastern. The Port Authority’s weekly advisory also lists lane and ramp work on approaches that drivers will use to reach the upper deck.
When each direction closes

For New Jersey-bound traffic, the lower deck is scheduled to close from 9 p.m. to 6 a.m. the next day. For New York-bound traffic, the closure runs from 9:30 p.m. to 5 a.m. Both lower-deck directions are closed during the seven and a half hours they overlap. Between 5 and 6 a.m., the lower deck is scheduled to be available toward New York while traffic headed to New Jersey still uses the upper deck.
An early departure toward New Jersey may still mean fewer lanes after the deck reopens. The Port Authority lists one westbound lower-deck lane closed from 8:30 a.m. to 2:30 p.m. Monday. From Tuesday through Friday, the daytime lane restriction starts at 6 a.m., as the overnight closure ends, and continues until 2:30 p.m.
From Manhattan or the Bronx
On the northbound Henry Hudson Parkway, the ramp to the New Jersey-bound lower deck closes at 10 p.m. Monday and at 9 p.m. Tuesday through Thursday, reopening at 6 a.m. each morning. Follow signs for the upper deck. On Monday night, even that ramp loses one lane from 10 p.m. to 5 a.m. If you normally leave the northbound parkway at 178th Street, that ramp also closes during those same Monday night hours. The agency lists Fort Washington Avenue as the alternative for that local exit.
From the Bronx, drivers reaching the crossing via the Alexander Hamilton Bridge should expect one lane to be closed on the westbound approach to the upper deck from 10 p.m. to 5 a.m. on Monday and Tuesday nights. Allow time for merging if you have a fixed arrival. Commercial drivers should also check the Port Authority’s standing truck restrictions and the NYC DOT truck route map. Trucks already have to use the upper deck, and the city map shows which local and through routes they can use to get there.
Drivers continuing toward the Bronx or Queens face a different ramp closure later in the week. From Tuesday through Thursday, the northbound Henry Hudson Parkway ramp onto the eastbound lower-level Trans-Manhattan Expressway closes from 9:30 p.m. to 5 a.m. The Port Authority directs drivers to exit at 178th Street. One lane on that street between Fort Washington Avenue and Broadway is also scheduled to be closed during those hours.
If you are considering a tunnel

The Holland Tunnel has overnight lane work in both directions during the same week. One New York-bound lane is scheduled to close at 11 p.m. and one New Jersey-bound lane at 11:30 p.m. The lanes are due back at 5 a.m. and 5:30 a.m., respectively. The Lincoln Tunnel has a tube closure starting at 11 p.m. each night, with traffic accommodated in other tubes. The Lincoln Tunnel Expressway is also scheduled to close from 11 p.m. to 5 a.m. on Monday, Tuesday and Wednesday nights.
For a trip between northern New Jersey and upper Manhattan, check the route to the upper deck before committing to a tunnel farther south. The Port Authority’s live crossing alerts and the 511NY travel map can show what is open on the night you drive. If the train also works for your trip, NJ Transit plans to return to its regular weekday schedule Monday.





