Researchers estimate that 403 of the largest U.S. data centers used about 1.8% of the country’s electricity in the year ending April 2025. Virginia, Oregon, Ohio and Iowa accounted for more than half of the electricity in the sample. How much carbon dioxide the facilities were responsible for depended in part on the power plants serving those regions.

The Harvard-led study announced Monday examined hyperscale data centers, the large facilities that support cloud computing and artificial intelligence. Researchers used satellite imagery to identify sites, modeled their electricity demand from May 2024 through April 2025 and used Environmental Protection Agency data to estimate the emissions associated with supplying them. The facilities can run many kinds of workloads, and the researchers couldn’t separate electricity used for AI from power used for other computing.

How much electricity the sites used

Server racks and overhead cable trays at the National Energy Research Scientific Computing Center
Server racks at the National Energy Research Scientific Computing Center in October 2011.Derrick Coetzee / Wikimedia Commons · CC0 1.0

The researchers estimated that the facilities used between 68 and 99 terawatt-hours, depending on how intensively the equipment ran. A terawatt-hour is a billion kilowatt-hours, the unit on a household electricity bill. At the upper end, the 403 sites together approached the annual electricity use of states such as Indiana, Michigan or Tennessee, according to the researchers. The 1.8% national share comes from a middle operating scenario.

That range captures how much the answer can change when equipment runs harder or sits idle for longer. The study models those differences across the facilities it identified. It does not give readers a year of meter readings for each site. The researchers also say they lacked enough information to study every hyperscale facility in the country, and their April 2025 cutoff leaves more recent openings and expansions out of the count.

Why the regional power mix matters

Two people beside server racks in the hot aisle at Facebook’s Oregon data center
The hot aisle at Facebook’s data center in Prineville, Oregon, in September 2013.Intel Free Press / Wikimedia Commons · CC BY 2.0

In the study’s estimate, fossil fuels accounted for roughly 54% of the power used by the facilities. Natural gas supplied about 38%, and coal about 15%. Harvard reported about 25.7 million metric tons of carbon dioxide associated with the electricity used over the year. Those emissions are attributed to the generation supplying the sites, which can happen far from the buildings that house the servers.

The researchers used EPA’s eGRID database, which publishes generation, fuel-mix and emissions data for U.S. electricity systems. For two facilities drawing the same amount of power, the estimate can differ if one relies on a regional power mix with more fossil fuels. The study did not measure health effects around the facilities or the power plants. Its national emissions total cannot tell a reader what pollution exposure changed in a particular community.

How to read the forecasts for 2030

Lawrence Berkeley National Laboratory asked a wider question in a separate report published in June. Its researchers modeled the entire U.S. data center industry, using equipment shipment estimates, power use for different devices and simulations of cooling systems. They estimate data centers could account for 11.8% of U.S. electricity use in 2030 in their central case. Their scenarios span 9.5% to 15.3%, depending on factors such as how many specialized chips are installed and how intensively servers are used.

The Harvard figure estimates a past year for 403 large sites. The Berkeley Lab figure projects future demand for the whole industry. Comparing the two percentages directly would mix a change in the facilities counted with a change in how much power the industry might use.

The new study also does not calculate the effect of a campus on household electric bills. In a local rate case, the question is who pays for new substations, power lines or generating capacity. A utility filing can show what equipment a project requires, and a regulator’s order can show how its cost will be allocated. Those are the records to look for when a utility proposes work to serve a new data center. Edit USA has separately reported on research about how data center development can affect household electricity bills.